Search blog.co.uk

Not far to go

by regor @ 2008-08-10 - 13:27:15

Nearly there! Only got to connect the sink waste and water supply, have the gas connected to the cooker and hob, then add the finishing touches. A tiled splash back will be added on the cooker and sink side. New lighting has been installed,originaly it was stip lighting with each light using 24 watts,brass eyeballs have now been installed and fitted with MR16 LED bulbs. These bulbs come in sizes of 0.8 watt to 5 watts. I will probably use 3 watt 120 degree angle bulbs as these give a big power saving compared to the old strip lights.

P8090184

P8090185

P8090188


 
 

Trackback address for this post:

authimage

Comments, Trackbacks:

No Comments/Trackbacks for this post yet...

Leave a comment :

Your email address will not be displayed on this site.
Your URL will be displayed.
Allowed XHTML tags: <!, p, ul, ol, li, dl, dt, dd, address, blockquote, ins, del, a, span, bdo, br, em, strong, dfn, code, samp, kdb, var, cite, abbr, acronym, q, sub, sup, tt, i, b, big, small, img>
URLs, email, AIM and ICQs will be converted automatically.
Options:
 
(Line breaks become <br />)
(Set cookies for name, email & url)
Validation code:
Please enter the above code here:
For protection from spambots (case-sensitive).

Recent Posts

  1. The kitchen rebuild
    by regor on 2008-07-22

Footer

The content of this website belongs to a private person, blog.co.uk is not responsible for the content of this website.